A practical, step-by-step plan for moving off Jira: what comes across, how to export Jira to CSV, how fields map, and how to run both tools in parallel so nobody loses a sprint during the switch.
Guided migration wizard on Professional and above · Assisted migration on Business
Knowing up front what imports, and what you will rebuild, is the difference between a calm cutover and a stressful one.
From Jira Software or Jira Cloud, on Professional and above. Existing test suites can be brought in separately through bulk test case import.
| Plan | Migration help included |
|---|---|
| Starter (free) | Import not available. Good for a pilot sprint on a new project created in Sprint Bridge. |
| Professional | Guided migration wizard, self-service |
| Business | Guided migration wizard plus assisted migration support |
| Enterprise | Dedicated migration engagement with your account manager |
Plan details and prices are on the pricing page. Every import source is listed on the integrations page.
An hour spent here saves days later. Work through this list with your Jira admin and one Scrum Master from each team.
The same sequence works for one team or twenty. Larger organisations simply repeat steps 3 to 5 for each group of projects.
Request a workspace, invite your users and assign roles: Administrator, Scrum Master, Product Owner, Developer, Tester or Stakeholder. Create a project for each Jira project you are moving and choose its workflow mode: Sprint, Kanban or Hybrid (Hybrid needs Professional or above).
Configure workflow states to match the Jira statuses you documented, and set up story, defect and task templates so imported work lands in a familiar structure.
Jira's built-in export works from the issue search. In Jira Cloud:
project = ABC ORDER BY created ASC. Include resolved issues so your backup is complete.AND created >= 2025-01-01 date ranges. Jira caps the number of issues in a single export.Keep this export even after you move: it is your record of comments, history, sprints and everything else the Sprint Bridge import does not bring across. A CSV export holds issue data, not the attachment files themselves.
On Professional and above, start the guided migration wizard and choose Jira as the source. Each Jira issue comes across as a work item with its title, description and story points. Then group the imported work items into the epics, sprints and workflow states you set up in step 1.
Start with your pilot project only. On Business and Enterprise, your assisted migration contact or account manager can review the mapping with you before you import everything.

Compare issue counts per project and per issue type against the Jira export. Open a sample of work items and check titles, descriptions and story points, then confirm each one sits in the right epic, sprint and status. Then have the pilot team run one real sprint and note anything that felt wrong.
Fix the mapping based on what the pilot found, then import the rest of your projects in batches. Re-check counts after each batch. Velocity history and burndown begin building in Sprint Bridge from the first sprint you run there.
On the freeze date, move every team's active work to Sprint Bridge, import any issues created in Jira since your last export, and switch Jira to read-only. Keep it available for reference until you are confident nothing is missing, then cancel the subscription.
How common Jira concepts translate. Where a row says verify, check it during your pilot import before you move everything.
| Jira | Sprint Bridge | Notes |
|---|---|---|
| Project | Project | Starter allows 1 project; Professional and above are unlimited. |
| Summary | Work item title | Imported. |
| Description | Work item description | Imported. Run AI story quality scoring afterwards to tidy old tickets. |
| Story points | Story points | Imported, so estimates carry over into capacity planning. |
| Epic | Epic | Not imported. Recreate the epics you need; Business adds portfolio and roadmap views above them. |
| Sprint | Sprint | Not imported. Plan your next sprint in Sprint Bridge; velocity builds from there. |
| Issue type (Story, Task, Bug, Sub-task) | Story, task or defect | Not imported. Set the type on imported work items as you organize them. |
| Comments, attachments, history | Jira backup | Not imported. Keep your Jira export or a read-only Jira site for reference. |
| Scrum or Kanban board | Project workflow mode | Choose Sprint, Kanban or Hybrid per project; WIP limits and swim lanes are set on the board. |
| Workflow statuses | Workflow states | Not imported. Configure states first, then set each work item's state. |
| Custom fields | Not imported | Decide which fields you still need and recreate only those. |
| Project roles | Roles | Administrator, Scrum Master, Product Owner, Developer, Tester, Stakeholder. |
| Zephyr test cases | Test cases | Use bulk test case import; tests then live alongside the stories they validate. |
| Tempo worklogs | Time entries | Not covered by the import; plan to start fresh or keep history in your Jira backup. |
| Dashboards & reports | Built-in KPIs | Rebuild only what you still need; 40+ KPIs are calculated automatically. |
| Automation rules | Rebuild manually | Not imported. Review which rules are still needed before recreating them. |
A big-bang switch on a Monday morning is the riskiest way to change tools. A short parallel period lets teams build confidence without stopping delivery.
Pilot first. One team runs its next sprint in Sprint Bridge while everyone else stays on Jira. Starter is free for up to 10 users, so a pilot on a fresh project can start before anyone signs a contract; importing existing Jira work needs Professional or above.
One source of truth per team. Each team works in exactly one tool at a time. Double entry is where data drift and frustration come from.
Freeze, then read-only. After the freeze date, create new work only in Sprint Bridge, import the final delta from Jira, and set Jira to read-only so history is still searchable.
Jira and Sprint Bridge do not sync, which is why each team should work in exactly one tool. For a longer, phased rollout, move teams over one at a time; book a migration demo to plan the order.
Answers to the questions teams ask most before a Jira migration.
Book a migration demo to walk through your Jira setup, or start a free Starter workspace and run a pilot sprint today.